River to Magnolia Pipeline

Pipeline

Shreveport, LA

“MACH was easy to work with very professional. Our inspectors in the field commended their communication, quality of work, and safety culture. The project had difficult weather and soil conditions, but MACH worked through obstacles that faced them and got the job done successfully.”

— HGA / Aethon Energy

Overview

MACH worked with both the construction management firm and the end user (a major producer in the region) to install 3 miles of 24″ in Louisiana for a high-pressure gas application. The high groundwater table presented a touch challenge, which MACH overcame using a well point system.

15,000

Linear Feet

24

Diameter Inches

3,960

MATS Installed

980

GEOTEX Pipeline Weights

Project Gallery