WHAT THE CLIENT NEEDED
The client was building a 200MMSCFD gas plant and needed a contractor to complete the amine plant installation as the plant contractor wasn’t able to keep schedule.
HOW MACH MET THE NEEDS
MACH executed the structural, mechanical and electrical scopes while working alongside the contractor constructing the cryogenic portion of the plant.